Floor decor's specificationItem No.:XMF0670-1BName :Floor decor/Porcelain tilesSize MM:300×300Material:Ceramic tileThickness(MM):8Color:Stone style with goldUsage:Floor and wallFeature :polished,optical to gilding surfaceMinimum Order:550 pcsPa
Hot design Ceramic Tile ( XMF0670-1B ) 详细介绍是:
Floor decor's specification | ||||||||
| Item No.: | XMF0670-1B | |||||||
| Name : | Floor decor/Porcelain tiles | |||||||
| Size MM: | 300×300 | |||||||
| Material: | Ceramic tile | |||||||
| Thickness(MM): | 8 | |||||||
| Color: | Stone style with gold | |||||||
| Usage: | Floor and wall | |||||||
| Feature : | polished,optical to gilding surface | |||||||
| Minimum Order: | 550 pcs | |||||||
| Packing: | foam box,11pcs/box,19kg/box | |||||||
| Water absorption: | 13%-18& | |||||||
| Delivery period: | 8 days | |||||||
| Payment Terms : | 30% TT in advance,remainder 70% paid before shipment.Western Union | |||||||
| Remark: | The color and the size can be changed according to your request | |||||||
Operating Instructions:
1. Checking after Unpacking :Check the pattern, quantity and size of the product.
2. Test Construction:Before constructing, place the product onto the floor, confirm the direction and position of each tile according to the pattern and the atcual requirements.
3. Prepare Assistant Materials:common cement (12.5kg/), medium sand(34kg/), and white cement (0.5kg/) for filling the gaps after constructing and 107 glue etc.
4. Suggestions:Polished glazed tiles features very simple construction and can be constructed separatey or togerher with other decorations.
(1) Make sure the room is dry, do not construct when the weather is wet;
(2) Level the constructed surface before constructing;
(3) Construct the tiles dry or wet, the base for dry construction shall be hard;
(4) The gap shall range 1-3mm, it is sugested to apply 325#cement, the gaps for light color polished glazed tiles shall be filled with white cement for achieving harmonic effect;
(5) Please check the flatness and surface of the gap when constructing, adjust if necessary;
(6) After constructing, please remove the cement and dirt from the surface of the tiles with clean towel;
(7) The floor after constructing shall be maintained for 4-5 days for avoiding uneven effect a result of external force.